With the rapid development of distributed PV, many distributed PV devices are connected to the power grid, which is essential to optimize the scheduling in the power grid containing a high proportion of distrib.
How to optimize a grid containing a large number of distributed photovoltaics?
Optimizing the dispatch of a grid containing a large number of distributed photovoltaics. Considering the regulation effect of real-time tariffs and energy storage devices. The day-ahead optimal scheduling is solved using Wild horse optimizer.
Objective function In the optimization of edge nodes, in order to improve the photovoltaic absorption rate and reduce the network line loss, the power of its own distributed photovoltaic, improved energy storage and interruptible load, with the substantive function of reducing operating costs.
Why are distributed PV and energy storage plants considered a negative load?
In order to control the fluctuation of the grid load and reduce the peak-to-valley difference of the load, the distributed PV and energy storage plants are considered as "negative load" to define the equivalent load .
How to prevent overspeed in a photovoltaic system?
To prevent overspeed and ensure the integrity and stability of systems, power flow systems, stress nodes, power lines, distributed photovoltaic inverter control constraints, energy storage operation constraints, interruptible load response capacity and time constraints and other conditions are considered.
What is the power level of PV system?
The power of the system is 10 MVA, and the working level is 12.66 kV. Fig. 2 shows the system structure. The distribution of PV is in the 8th, 16th, 21st, 23rd and 32nd decade respectively. Connect the energy storage in contracts 5, 12 and 30.
How can'source-grid-load-storage' be optimized?
The synergy optimization and dispatch control of “Source-Grid-Load-Storage” and realization of multi energy complementary are effective ways to help achieve the optimized regulation of the whole power system at different levels.